Cobalt worked with its partners to realise the LED wall requirement for these 4000 passenger ships. We provided all mechanical and electrical design, wind loadings and interface requirements. Out local team supervised all frame manufacture and pre-testing in the UK before shipment. Our installation teams visited the vessel several times in keeping with the installation timetable to complete the installation successfully Partner – Wärtsilä FUNA
NCL Breakaway Plus class – all LED walls mechanical design and supply, installation & commissioning